Tentang Kami

Komitmen kami terhadap penciptaan nilai berkelanjutan dan membangun kepercayaan dengan semua pemangku kepentingan.

Performa Terbukti di Berbagai Medan

Offshore Fleet Rig 1

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock, a Latin professor at Hampden-Sydney College in Virginia, looked up one of the more obscure Latin words, consectetur, from a Lorem Ipsum passage, and going through the cites of the word in classical literature, discovered the undoubtable source. Lorem Ipsum comes from sections 1.10.32 and 1.10.33 of “de Finibus Bonorum et Malorum” (The Extremes of Good and Evil) by Cicero, written in 45 BC.

Rig Raisis 2

Submersible swamp barge, slot type built in 1982, acquired and upgraded in 2012, skidding
capability (four wells) added in 1998. 10,000 Psi BOP System – 5,000 Psi WP Mud Pump – 2,000 HP Drawwork and last dry dock in 2021.

Rig Yani 2

Submersible swamp barge, slot type, skidding over four wells, built in 2003 (KEPPEL FELS) with 10,000 Psi BOP System – 7,500 Psi WP Mud Pump – 2,000 HP Drawwork

Rig Maera 2

Apexindo first submersible swamp barge, built in 1992, added cantilever in 2003, and last dry dock in 2023.
10,000 Psi BOP System –7,500 Psi WP Mud Pump – 3,000 HP Drawwork

Rig Tasha 2

Super premium self-elevating cantilever drilling rig independent legs (Jack-Up) – 10,000 Psi Blow Out Preventer System – 3 ea. 7,500 Psi WP Mud